1. Product Introduction

The structure of the plasma cleaning machine is mainly divided into four major parts, which are the control unit, vacuum chamber , vacuum pump and plasma generator.
Features: The use of numerical control technology, high degree of automation; with high-precision control device, time control accuracy is very high; vacuum plasma cleaning will not produce a damaged layer on the surface, surface quality is guaranteed; because it is carried out in a vacuum, no pollution The environment ensures that the cleaned surface is not contaminated by secondary pollution.
Advantages:
1. The cavity volume and number of layers can be customized according to customer requirements;
2. Simple and efficient processing of irregular shaped products;
3. No pollution in the processing process;
4. Stable processing effect and uniform effect;
5. Simple maintenance and cost Low, easy for customers to control costs

 

Second, the machine configuration

Machine configuration
model EM060-07 EM120-09
Way of working Discharge under vacuum
power 500W 500W
Processing range 60L 120L
Equipment size 850*1050*1600mm
weight 300KG
Machine power 220VAC, 50HZ
Vacuum pump power supply 380V, 50HZ
frequency 25KHZ/13.56MHZ
Working gas Oil-free and water-free compressed air;
or argon + oxygen;
or nitrogen;
or argon-hydrogen mixed gas;
or carbon tetrafluoride;
 

3. Application areas

Biomedical industry


Infusion tube seat

Before coating such as gastric tube

Medical device disinfection

Textile and sole industry


Before printing

Sole cleaning

Non-woven fabric flame retardant pretreatment

IC semiconductor chip field


GPU chip

Wafer

chip

Circuit board industry


Remove slag before circuit board sinking copper

Before printed circuit board

Soft copper sink and before printing

Other industries


Silica gel

ceramics

Car central control screen

Aviation silver film

Polymer access

Curved glass

 

4. Installation Instructions

1. The ambient temperature is required to be between 15 and 35 ℃, and air conditioning is required;

2. There is an oil-free air compressor on site, it is recommended to match the power 2.2KW, the nominal volume flow is 200 L/min,

Rated exhaust pressure: 0.7MPA

3. Humidity requirement is 40%~80%, no condensation, dehumidifier should be installed;

4. Power grid requirements: AC220V, 50Hz;

5. Fluctuation of power supply grid: ± 5%, the ground wire of the grid meets international requirements. In areas where the voltage amplitude is more than 5%, automatic voltage stabilizing and current stabilizing devices should be installed;

6. There should be no strong electromagnetic signal interference near the installation equipment, and avoid radio transmission stations (or relay stations) around the installation site;

7. Foundation amplitude: less than 50um; vibration acceleration: less than 0.05g; avoid a lot of machine tools such as stamping nearby;

8. Equipment space requirements are guaranteed to be smoke-free and dust-free, and to avoid serious dust and metal working environment;

9. Air pressure: 0.4~0.7Mpa;

10. In some environments, anti-static floor should be installed to strengthen the shield, etc.;

If you have any questions, please contact us!

Contact Us

Copyright & copy; 2002-2020 guanghejie intelligent equipment (Suzhou) Co., Ltd. All Rights Reserved

Address:No.1 Workshop, No.300, Zhujiawan Road, Zhoushi Town, Kunshan City, Jiangsu Province

ServiceService Contact Code

Service hotline

19984889199

Scan, focus on us