1. Product Introduction
The structure of the plasma cleaning machine is mainly divided into four major parts, which are the control unit, vacuum chamber , vacuum pump and plasma generator.
Features: The use of numerical control technology, high degree of automation; with high-precision control device, time control accuracy is very high; vacuum plasma cleaning will not produce a damaged layer on the surface, surface quality is guaranteed; because it is carried out in a vacuum, no pollution The environment ensures that the cleaned surface is not contaminated by secondary pollution.
Advantages:
1. The cavity volume and number of layers can be customized according to customer requirements;
2. Simple and efficient processing of irregular shaped products;
3. No pollution in the processing process;
4. Stable processing effect and uniform effect;
5. Simple maintenance and cost Low, easy for customers to control costs

Second, the machine configuration
Machine configuration |
model |
EM060-07 |
EM120-09 |
Way of working |
Discharge under vacuum |
power |
500W |
500W |
Processing range |
60L |
120L |
Equipment size |
850*1050*1600mm |
weight |
300KG |
Machine power |
220VAC, 50HZ |
Vacuum pump power supply |
380V, 50HZ |
frequency |
25KHZ/13.56MHZ |
Working gas |
Oil-free and water-free compressed air;
or argon + oxygen;
or nitrogen;
or argon-hydrogen mixed gas;
or carbon tetrafluoride;
|
3. Application areas
Biomedical industry

Infusion tube seat |

Before coating such as gastric tube |

Medical device disinfection |
Textile and sole industry

Before printing |

Sole cleaning |

Non-woven fabric flame retardant pretreatment |
IC semiconductor chip field
Circuit board industry

Remove slag before circuit board sinking copper |

Before printed circuit board |

Soft copper sink and before printing |
Other industries

Silica gel |

ceramics |

Car central control screen |

Aviation silver film |

Polymer access |

Curved glass |
4. Installation Instructions
1. The ambient temperature is required to be between 15 and 35 ℃, and air conditioning is required;
2. An oil-free air compressor is required on site. It is recommended to match the power of 2.2KW, the nominal volume flow of 200 L/min, and the
rated discharge pressure: 0.7MPA
3 . Humidity requirement is 40% ~ 80%, no condensation, dehumidifier should be installed;
4. Power grid requirements: AC220V, 50Hz;
5. Power grid fluctuations: ± 5%, grid ground meets international requirements. In areas where the voltage amplitude is more than 5%, automatic voltage stabilization and current stabilization devices should be installed;
6. There should be no strong electromagnetic signal interference near the installation equipment, and there should be no radio transmitting station (or relay station) around the installation site;
7. Ground amplitude: less than 50um; vibration acceleration: less than 0.05g; avoid a large number of stamping and other machine tools nearby;
8. Equipment space requirements to ensure smoke-free and dust-free, avoid metal dusting and other serious working environment;
9. Air pressure: 0.4 ~ 0.7Mpa;
10. In some environments, anti-static floor should be installed to strengthen the shield, etc.;